__color__ ticket summary component priority status milestone type owner severity created _changetime _description _reporter 2 1 Inventory of Sensors sensor critical closed Buoy-System-2010 task haines desired 1277815567 1285875803 Create an inventory (database or spreadsheet) of sensors to with * make, model, serial number, * current location, * last calibration date, calibration period, * status (normal, broken, out-of-cal, missing). We need to be able to track which sensors need fixing and/or calibration. haines 2 2 Prepare buoys for shipment to YSI system integration critical closed Buoy-System-2010 task haines must have 1277817706 1285875484 Collect all components for YSI build out of the buoy systems * ~~one working set of sensors (to start work)~~ * ~~ensure buoy batteries function~~ * ~~collect all correct cables and connectors to sensors~~ * ~~collect components to sensors (e.g. rm young wind serial interface unit)~~ * ~~remove any IMS equipment that Tony and Rick do not want deployed~~ * ~~securing items for transport~~ haines 2 28 Order new Lifeline buoy batteries system integration critical closed Buoy-System-2010 task haines must have 1291816950 1298578002 Address battery capacity issues before deployment. We either need to order new buoy system batteries or refurbish the older ones. {{{ As of 2/24/2011 }}} Decision has been made to order new batteries (same make and model: Lifeline AGM) and have YSI install them ASAP while the buoys are still at the shop in Marion, MA. So changing this to system integration component. Order placed with CE BECKMAN CO in Bedford, MA. {{{ CE BECKMAN CO 11-35 Commercial Street New Bedford MA, 02740 Marine Wholesale & Service Station Phone: 508-994-9674 Fax: 508-990-2785 http://www.cebeckman.com/ }}} They will deliver batteries to YSI in Marion, MA tomorrow 2/25/2011. haines 2 38 Complete Buoy Structure Modifications hardware critical closed Buoy-System-2010 task haines must have 1301509997 1312292734 * contact Jimmy Bircher a local welder to help modify buoy CG * let Jim Bircher and John Wallinga decide best cost-effective solution Bircher, Inc to do the following work * order s/s rods (~500 lbs) for each buoy * cut and install 4 rods on each buoy * machine bale key-hole bushing using 4140 steal on one buoy {{{ Jimmy Bircher Bircher Inc Machine Shop 119 Industrial Dr. Moreahead City, NC 28557 bircher@bizec.rr.com 252-726-5470 252-241-5811 (cell) bircherinc.com }}} haines 2 39 Resolve Issues with YSI System Integration system integration critical closed Buoy-System-2010 task haines must have 1301516392 1326301898 * review the upgrades/retrofits to the buoys and tower package * see how the systems are constructed and operating, and make any changes that might be wise * work through the communications protocols implemented * collect documents and software haines 2 44 Order Replacement Beacon hardware critical closed Buoy-System-2010 task haines must have 1310483432 1310502119 One of the navigational beacons was full of water. Freddy removed from buoy. Water inside. We have to replace this before deployment. Use same flash pattern listed on Nav Chart for LSRB. Private Aid flash pattern of "Fl Y 4s" (Short flash every 4 seconds) {{{ Carmanah 700 Series Amber Solar powered meets all requirements of USCG in 33 CFR, part 66 www.carmanah.com 250-380-0052 }}} {{{ Savannah Location: First Choice Marine Supply 122 Pipemaker's Circle Unit 200 Pooler, GA 31322 Tel: 912-998-0023 Fax: 912-998-0028 savannah@FirstChoiceMarineSupply.com }}} haines 2 60 B1 stopped communicating communication critical closed Buoy-System-2010 task haines must have 1326302463 1330616729 Dec 18, 2011 at 1300 UTC * No GlobalStar comms with B1 since Dec 18, 2011 at 1300 UTC * comm Logs on LoggerNet indicate some trouble communicating (extra of extra connects and disconnects within an hour) while several days to weeks prior each connection would get all the data and be done with mostly one call. * GlobalStar VPN is functioning (can ping the loopback and can ping tower package GS modem when on and sat coverage) * monitor for weather window to go visit B1 Jan 11, 2012 * I've tried direct dial to Iridium Modem on B1 (modem to modem) from Murray Roof but B1 does not answer. Either problem with Iridium -- or not on or larger systemic power issue. This may be more than a comm problem and may change ticket to system if Feb 27, 2012 * Confirmed B1 destroyed in same manner as B1. See [http://sarahaines.smugmug.com/Work/B1-Destroyed-Feb-27-2012/ photos taken on Feb 27] haines 2 61 B2 stopped communicating communication critical closed Buoy-System-2010 task haines must have 1326303414 1330616642 Dec 29, 2011 at 1400 UTC * B2 stopped communicating on Dec 29, 2011 at 1400 UTC * Not sure why GS stopped communicating -- comm logs do not show any awkward behaviour prior * All B2 system data (battery ~12 volts okay, no leak detection) Jan 06, 2011 at 1730 * Setup 3rd Iridium on Murray roof and dialed direct to B2 * Initially got in and downloaded table defs, and got ports and flags * put it in manual mode (flag(2)) but accidentally turned off the iridium power while still in manual mode * This now makes B2 non-functional (no data collection) and I cannot communicate via Iridium since it is off. * Elevating it to critical * monitor for weather window and visit B2 Feb 06, 2012 * confirmed B2 is destroyed see photos [http://sarahaines.smugmug.com/Work/Buoy-Destroyed-Feb-06-2012/ Photos taken on Feb 06] haines 2 3 Draft Tower Safety Plan with Navy deployment critical closed Tower-System-2010 task haines must have 1277837465 1297719727 * Fill out and submit draft Harzards Management Plan (HMP) to UNC EHS. * Work with Navy to complete HMP. haines 2 12 Determine if any power and communication requirements for Navy components deployment critical closed Tower-System-2010 task haines must have 1285876473 1297720498 Evaluate the additional bandwidth and power required to support the Navy NRG wind anemometers, the LIDAR NRG Wind Cube, Satellite (IMARSAT and GlobalStar) Communications, in addition to UNC met suite and Scintec SODAR. haines 2 33 Finalize Hazards Management Plan (HMP) at UNC deployment critical assigned Tower-System-2010 task haines * must have 1297719449 1297719565 * Fill out and submit draft HMP to UNC EHS. * Work with Navy to complete HMP. * Add to HMP type and range of vessel used for installation and decommission of equipment versus maintenance and operation. haines 3 7 Recalibrate RM Young Wind Monitors (1st batch) sensor major closed Buoy-System-2010 task haines must have 1277842797 1285952772 * ~~fill out RMA form and send with shipment~~ * ~~ship to RM Young~~ Fedex Ground 9/10/2010 * ~~received quote for repair and cal~~ * ~~returned payment info~~ * 3-4 weeks turn around from email Ryan Phillips at rphillips at youngusa.com haines 3 8 Recalibrate Eppley PIR and PSP sensors (1st set) sensor major closed Buoy-System-2010 task haines must have 1277846514 1289499579 * Get PIR and PSP from Kenan Roof * Contact Eppley Labs about recalibration of 2 sets of PSP and PIR sensors and what arrangements need to be made * Ship and make payment Only need to send contact info with shipment. We will be contacted about costs when received by Eppley. THE EPPLEY LABORATORY, INC. 12 Sheffield Avenue, PO Box 419 Newport, Rhode Island 02840 USA Tel: 401-847-1020 Fax: 401-847-1031 Email: info@eppleylab.com haines 3 9 Recalibrate Rotonic Temp/Humidity sensors sensor major closed Buoy-System-2010 task haines must have 1277846580 1289508917 * Obtain RNA from Rotronic * Rotronic web page for services [http://www.rotronic-usa.com/service/calibration%20and%20repair%20service.htm] * shipped to Rotronic haines 3 10 Reserve ship for buoy deployments deployment major closed Buoy-System-2010 task seim must have 1282853940 1312461343 * Define requirements for ship capability * Determine ship availability * Schedule ship (forms, port-of-call, dates) We need about an 80 foot vessel with A-frame or J-frame capable of handling buoy size and weight (13 feet tall non-instrumented, 15+ feet tall instrumented, 6.5 fee diameter, 2200 lbs) and anchor weight (~2800-3000 lbs) plus 30m 3/4" chain and cable. Harvey made contact with several different ships that could help. * R/V Savannah (SKIO) $10K+ per day (too expensive and very busy) * R/V Dan Moore (Cape Fear Community College) $9K+ per day (too expensive) * Some vessels in Virginia (Udel, Chesapeake Bay buoy tender) * New NOAA SRVx (Monitor National Marine Sanctuary support vessel) The NOAA SRVx vessel and crew are available and capable to handle our deployment requirements. First available time is Aug 18-22. Our alternate deployment window will be early October. Here are some other characteristics and links: {{{ BUILDER:.......................Guardian Marine; Edmonds, Wash. DESIGN:........................Fiberglass sandwich core construction LENGTH:........................85 feet BEAM:..........................23 feet RANGE:.........................1,700 nautical miles SPEED:.........................35 knots HORSEPOWER:....................Two 2,735-horsepower MTU World PROPULSION: ...................2 MTU 12V 4000 series ACCOMMODATIONS:................3 crew; 4 crew for 24-hour operation A-FRAME:.......................4000 lb limit }}} Here is a link to pictures of the NOAA SRVx * http://oceanexplorer.noaa.gov/explorations/10sbnms/media/slideshow/flash_slideshow.html Contact Info for NOAA SRVx has been through {{{ David W. Alberg Sanctuary Superintendent Monitor National Marine Sanctuary National Oceanic and Atmospheric Administration 100 Museum Drive Newport News, VA 23606 Phone: (757) 591-7326 Mobile: (757) 869-4291 Fax: (757) 591-7353 www.monitor.noaa.gov }}} haines 3 11 Obtain approval for mooring locations deployment major closed Buoy-System-2010 task haines must have 1282854507 1319811541 * Contact Coast Guard for requirements of registering location and buoy as a Private Aid to Navigation (PATON) * fill out form CG-2554 (blank form attached) * Contact US Army Corp of Engineers to obtain permit or permission to deploy buoys in proposed locations * lighting, notices, or placard requirements * charted locations * notice to mariners issued {{{ Thomas W. Flynn LCDR, USCG (Retired) Marine Information Specialist Tel: (757) 398-6229 FAX: (757) 398-6303 }}} {{{ > Josh R. Pelletier > Regulatory Specialist > United States Army Corps of Engineers > Washington Regulatory Field Office > Post Office Box 1000 > Washington, North Carolina 27889 > (910) 251-4605 }}} {{{ Dave Timpy at 910-251-4634 US Army Corp of Engineers }}} haines 3 14 Recalibrate Seabird CTDs (1st batch) sensor major closed Buoy-System-2010 task haines must have 1285950909 1289508978 Ship and have recalibrate first 4 CTDs at Seabird (2 IMPs and 2 SMPs) * Get info on procedure for shipment and return * Instructions: http://www.seabird.com/customer_support/Servreq.htm * After cal, ship to MA ?? haines 3 15 Recalibrate Seabird CTDs (2nd batch) sensor major closed Buoy-System-2010 task haines must have 1285952522 1287505115 Ship and recalibrate CTDs (2 IMPs) * Ship from MA * Delivery to ?? Two new 37-IMPs were sent with buoy system. This ticket is not necessary for this buoy deployment, hence marking "invalid" since no other option in trac to remove or label it. haines 3 16 Recalibrate RM Young Wind Monitors (2nd batch) sensor major closed Buoy-System-2010 task haines must have 1285952870 1289509006 * fill out RMA form and send with shipment * ship to RM Young * receive quote for repair and cal * returned payment info acceptance * 3-4 weeks turn around from email Ryan Phillips at rphillips at youngusa.com haines 3 17 Purchase HRM3300 Compass and Tilt Sensor system integration major closed Buoy-System-2010 task haines must have 1285953717 1292452929 After consultation with YSI buoy group, we will use Honeywell HRM3300. Type they use and it will perform same functions as PNI TCM2 (buoy heading for wind and fast rate 3Hz buoy motion status). * we will need to purchase 2 of these (for now YSI has some in stock they can use) The need to purchase two new buoy compasses was determined on Sept 14, 2010 while getting the buoys ready to ship to MA. The housing for Buoy 2 was flooded with water up to the brim. Assuming the same on Buoy 1. haines 3 22 Order ADCP Batteries deployment major closed Buoy-System-2010 task haines must have 1287004821 1312292662 haines 3 23 Order Acoustic Release Batteries deployment major closed Buoy-System-2010 task haines must have 1287004843 1298559721 ORE Offshore 4 Little Brook Road West Wareham, MA 02576 T: 508-291-0960 F: 508-291-0975 Contact our team directly: Greg MacEachern Communication & Control maceachern@ore.com Spoke with Greg MacEachern: Placed order on Feb 16, 2011 * qty 4 $145 each battery for C.A.R.T P/N B32174-002 * qty 4 $40 each anode sacrafice P/N A977110 The purge manifold is not something they sell. We can construct one with two valves, nitrogen canister or supply, and vacuum pump with gauge. haines 3 24 Recalibrate Eppley PIR and PSP sensors (2nd set) sensor major closed Buoy-System-2010 task haines must have 1287504866 1291933446 * After 1st set calibrated and returned * Package 2nd set for shipment * Ship and make payment Only need to send contact info with shipment. We will be contacted about costs when received by Eppley. THE EPPLEY LABORATORY, INC. 12 Sheffield Avenue, PO Box 419 Newport, Rhode Island 02840 USA Tel: 401-847-1020 Fax: 401-847-1031 Email: info@eppleylab.com haines 3 25 Purchase Garmin GPS 16/17 OEM system integration major closed Buoy-System-2010 task haines must have 1289509830 1291668809 YSI determined that one of the GPS units in not working so need a replacement. haines 3 26 Purchase Xantrex LinkPRO system integration major closed Buoy-System-2010 task haines must have 1291668927 1291668946 Purchase newer model linkPro for buoy and tower systems. Uses less power and has a nice lcd display instead of backlight. haines 3 27 Obtain mooring design specifications hardware major closed Buoy-System-2010 task haines must have 1291669929 1301507547 We now have mooring design from John Wallinga. See attachments. [http://trac.nccoos.org/platforms/ticket/27/UNC_30meters.xlsx UNC_30meters.xlsx] ---- * ~~contact John Wallinga at UMaine to go over mooring design steps for buoys.~~ * ~~contact Tony to get inventory of what mooring hardware we have at IMS~~ * ~~contract with John Wallinga at UMaine to design mooring components, lengths and specifications.~~ John will provide us with a list of parts, how much or how many, and suppliers for all the bits and pieces. 1. we need to provide John Wallinga with tidal range, estimated currents and length of deployment. 2. JW will provide us with a mooring specification and list parts and lengths for these deployments. 3. JW will communicate design specifications of buoy modifications to be done with shop in MHC. haines 3 30 Activate Globalstar Service system integration major closed Buoy-System-2010 task haines must have 1292943689 1292943958 Fill out and complete any forms to sign up for Globalstar Satellite Service haines 3 31 Activate INMARSAT Service system integration major closed Buoy-System-2010 task haines must have 1292943925 1299106343 Geoff Morrison with Sea Keepers activated 3 Sat-C transcievers (INMARSAT-C) through Vizada Case #00264366 : request for SatC activation Data will be coded per Sea Keepers protocol to hexadecimal message on each buoy, the data will be transmitted to private mailbox via satellite comms, then sea keepers server pulls and decodes message for posting onto Sea Keepers website and posting to FTP site for NDBC and GTS to grab. Examples of how the data will look can be seen on http://data.seakeepers.org haines 3 34 Order Acoustic Modem Batteries deployment major closed Buoy-System-2010 task haines must have 1299097326 1312300503 * order extra batteries for LinkQuest UVM1000 acoustic modem * order spare spider cable that connects (one at YSI has broken pin) haines 3 35 Order Mooring Chain and Hardware hardware major closed Buoy-System-2010 task haines must have 1299100032 1303139197 * place order with Steve Tabor at Trawl Works {{{ Trawl Works P.O. Box 34230 Walts Way Narragansett, RI 02882 Tel:(401) 789-3964 sales@trawlworks.com }}} haines 3 36 Order Wire Rope for Mooring hardware major closed Buoy-System-2010 task haines must have 1301508511 1303139247 * Place order with James Cappellini (james@mooringsystems.com) * (2) 20 meter length of 3/8" jacketed 3 x 19 wire rope with termination {{{ Mooring Systems, Inc. P.O. Box 413 1227 Route 28A (Map) Cataumet, MA 02534 Phone: 508-564-4770 Email: sales@mooringsystems.com }}} haines 3 37 Order Railroad Car Wheels for Mooring hardware major closed Buoy-System-2010 task haines must have 1301509062 1304362244 * Place order with Frit Car in Bridgeton, NC {{{ Frit Car, Inc Bridgeton, NC Facility P.O. Box 569 Highway 17 North Bridgeton, NC 28519 http://www.fritcar.com/ Phone:(252) 638-2675 Fax:(252) 638-5125 Del. Carrier: Norfolk Southern 2 Wheels for $500, price includes removing axle Gary at Frit is looking for someone to deliver them for us. }}} * Alternative -- RR wheels Jerry Solt at Wheelworx.com {{{ jerry@wheelworx.com 614-325-8071 614-834-4783 $145/wheel and arrange our own drop shipment }}} haines 3 40 Test GlobalStar Communication via LoggerNet communication major closed Buoy-System-2010 task haines must have 1303139562 1304429734 * Configure LoggerNet on turb.marine.unc.edu to access each system via GlobalStar Network * Buoy 1 * Buoy 2 Issues raised during testing: * modems set for direct dial via ground station for GlobalStar network -- not static IPs * analog phone line required Successfully tested dial-up to Tower system only from analog line (Sara's home phone). Contacted University Telecommunications. Cost for line analog line to be installed is ~$100 initially, but service is $50/month (with unlimited long distance). Installing analog line is not a reasonable solution as we can only dial one buoy or system at a time and it will be hard to move (requires additional $100 to move to another telephone port). Opening new tickets ([ticket:42 42] and [ticket:43 43])about service setup and hardware necessary to have static IPs for each GlobalStar modem. haines 3 42 Place order for GlobalStar static IP/VPN service communication major closed Buoy-System-2010 task haines must have 1304428502 1310483504 * establish account for static IP to GlobalStar modems, one time fee $2000 for service, includes GlobalStar VPN router for campus * return GlobalStar modems to ECI for reconfiguring $150 per modem for static IP {{{ David O'Hara NETSAT Office Direct: 303-683-4843 Fax: 866-880-7069 Cell: 303-229-7222 david.ohara@netsat.info www.netsat.info }}} {{{ Ron Mozer attn. Crystalline, 210 Riverview Dr. Monessen PA. 15062 }}} haines 3 43 Configure and Test GlobalStar VPN and static IPs communication major closed Buoy-System-2010 task haines must have 1304428811 1326813162 * contact ITS to obtain two subnets required for VPN router to Globalstar (GS). * all three modems reconfigured for static IP * once GS VPN router arrives, contact ITS again for port forwarding allocations so public computer (turb.marine.unc.edu) can access the VPN router * setup and test Globalstar VPN router on campus with GS loopback adapter * install and setup second ethernet adapter for turb.marine for VPN connection * change registry setting on turb.marine to allow additional polling per instructions from Ron Mozer at Crystalline * test GS modems with ping and test telnet The phone numbers of our GlobalStar/ExtraNetCC satellite units: {{{ ESN: 11601178763 / Phone# 999-008-1921 / IP: 10.1.64.1 (Buoy) ESN: 11601178914 / Phone# 999-008-1922 / IP: 10.1.64.2 (Buoy) ESN: 11601178933 / Phone# 999-008-1923 / IP: 10.1.64.3 (Tower) }}} {{{ Adair Thaxton Network Specialist, ITS Networking 440 W. Franklin St., Suite 1011 UNC Chapel Hill, (919) 445-9387 sthaxton@email.unc.edu }}} {{{ Matt Lord Manager, Communications Engineering Globalstar 461 S. Milpitas Blvd. Milpitas, CA 95035 P. 408.933.4507 matt.lord@globalstar.com }}} {{{ Brian Nordman | Crystalline Technology ??? | Monessen | PA | 15062 | USA T 724-638-8048 | M 724.557.8474 Brian@Crystalline.us Ron Mozer | Crystalline Technology ??? | Monessen| PA | 15062 | USA T 724-638-8048 | ron@Crystalline.us }}} This ticket is follow-on to ticket titled "Testing Globalstar from Loggernet" (ticket:40) where testing was successfully completed on straight dialup and "Setup GlobalStar static IP/VPN service" (ticket:42) where the order was placed for VPN IP service through NetSat and David O'hara. haines 3 45 Place order for Iridium/Rudics static IP service communication major closed Buoy-System-2010 task haines must have 1310483693 1335966497 order for Iridium/Rudics static IP service * contact Joubeh to begin order for Rudics * provide static IP of server a, port number and a group name * or Mobile Terminated (telnet) just an IP * activate modems with email to Joubeh once Iridium as confirmed connection and group name Intructions from Joubeh: "Once we have confirmation from Iridium that the connection is completed we will be in touch and provide the RUDICS group name and account number for activation purposes." haines 3 46 Configure and Test Iridium/Rudics static IPs communication major closed Buoy-System-2010 task haines must have 1310483779 1335962305 * Establish Rudics service through Joubeh, * request activation of SIM's through Joubeh (see attached instructions) * tested Iridium modems using CSI Loggernet. There are telnet handshaking commands to issue to the ground station that they call the specifically assigned MSISDN-C number. haines 3 47 Re-assemble anchors hardware major closed Buoy-System-2010 task haines must have 1312299480 1312299490 * re-assemble stacks of three (3) RR car wheels on original spindles * tack weld together to secure for loading and deployment haines 3 48 Assemble and check mooring hardware hardware major closed Buoy-System-2010 task seim must have 1312299935 1312299968 * layout and verify all parts for mooring hardware * determine all mechanical connections and links * determine size of swivels for sizing sacrificial anodes * purchase axle-shaft anodes for swivels * determine diameter of cabling to determine SBE Inductive Modem CTDs and Inductive Coupling Cables (ICC) have proper delrin fittings. NOTE: at West Marine, in Morehead City, can use IMS account for discount on many items haines 3 49 Order from SBE additional Inductive Cable Coupler (ICC) sensor major closed Buoy-System-2010 task seim must have 1312300113 1312300118 * order second Inductive Cable Coupler (ICC) for B2 from SeaBird Electronics (SBE) haines 3 50 Test BrightWaters deployment major closed Buoy-System-2010 task haines must have 1312461139 1318365626 Brightwaters Argos/GPS Mooring Monitors PTT #22363 and #22438 * Both BrightWaters Argos trackers need to tested * test battery capacity (before charge, after charge and hold charge) * test tracking thru Argos Satellite * confirm GPS posn tracking thru messaging Tests and prep completed: * PTT 22438 battery replaced 24.5v (old one was dead -- 1.5v) * PTT 22363 battery okay 23.9v * Argos position show up on argosweb -- https://argos-system.clsamerica.com/cwi/Consult.do for Chapel Hill * And again after "superreset" at IMS * Decoded message of GPS data sent by Mooring Monitor over Argos, using ARG104.exe. haines 3 51 Configure ADCPs sensor major closed Buoy-System-2010 task haines must have 1312461212 1318366853 * configure ADCPs * test configuration * install fresh batteries Name deployment Wind 2011 B1 or B2 to replace default filename on ADCP. RNW11B1 or RNW11B2 Configuration Work Plan settings as follows {{{ CR1 CF11101 EA0 EB0 ED300 ES35 EX11111 EZ1111101 WA255 WB0 WD111100000 WF88 WN35 WP50 WS100 WV175 HD111000000 HB5 HP2400 HR06:00:00.00 HT00:00:00.50 TE00:30:00.00 TP00:36.00 CK CS ; ;Instrument = Workhorse Sentinel ;Frequency = 614400 ;Water Profile = YES ;Bottom Track = NO ;High Res. Modes = NO ;High Rate Pinging = NO ;Shallow Bottom Mode= NO ;Wave Gauge = YES ;Lowered ADCP = NO ;Ice Track = NO ;Surface Track = NO ;Beam angle = 20 ;Temperature = 10.00 ;Deployment hours = 4320.00 ;Battery packs = 1 ;Automatic TP = YES ;Memory size [MB] = 448 ;Saved Screen = 2 ; ;Consequences generated by PlanADCP version 2.06: ;First cell range = 2.10 m ;Last cell range = 36.10 m ;Max range = 43.93 m ;Standard deviation = 0.99 cm/s ;Ensemble size = 854 bytes ;Storage required = 135.63 MB (142220160 bytes) ;Power usage = 489.44 Wh ;Battery usage = 1.1 ;Samples / Wv Burst = 2400 ;Min NonDir Wave Per= 2.59 s ;Min Dir Wave Period= 4.31 s ;Bytes / Wave Burst = 187280 ; ; WARNINGS AND CAUTIONS: ; There are not enough battery packs for the deployment. (1 battery pack(s) will last 165 days). ; Waves Gauge feature has to be installed in Workhorse to use selected option. ; Advanced settings have been changed. }}} haines 3 52 Configure CTDs sensor major closed Buoy-System-2010 task haines must have 1312461246 1318366218 * Configure CTDs for deployment * install fresh batteries On deck issued "stop" and to stop waiting for start time, then issued "startnow" to manual force sampling to start. {{{ S>ds SBE37-SM V 2.5 SERIAL NO. 3584 05 Oct 2011 22:06:35 not logging: waiting to start at 06 Oct 2011 12:00:00 sample interval = 360 seconds samplenumber = 0, free = 190650 transmit real-time data do not output salinity with each sample do not output sound velocity with each sample store time with each sample number of samples to average = 4 serial sync mode disabled wait time after serial sync sampling = 30 seconds temperature = 23.16 deg C S>stop S>startnow start now }}} Confirmed pumping within about 6 minutes. haines 3 53 Configure and Test Pop-up Releases deployment major closed Buoy-System-2010 task haines must have 1312461486 1318367113 * test ORE acoustic releases and install new batteries * test with deck unit * purchase new rope for both pop-ups Prepared and tested 29207 and 31224. 29207 is so corroded shaft arm no working so sending it to ORE Offshore (RMA 2033) to get fixed. Used 30608 -- already new battery but checked oil leak on transducer head and replaced screw where small leak was dripping. There was not much mineral oil lost and tested unit works fine. haines 3 54 Prepare Bottom Frames deployment major closed Buoy-System-2010 task haines must have 1312461676 1318366894 * tape sensors for antifoulant * mount ADCP, CTD * install pop-up canistor and rope * mount acoustic release * mount sacrificial anodes haines 3 55 Order SBE 37 CTD batteries sensor major closed Buoy-System-2010 task haines must have 1318531540 1319209755 Seabird does not make older batteries p/n 50243.1 (80981.1 ??) with 6 batteries. We need to buy the retrofit battery holder for all our units younger than 1999. Our oldest CTD is 2001 so the retrofit (red) lithium battery holder will work in all of our units. The retrofit holders (p/n 801797) are $150/each. Lithium battery packs (12 AA batteries) (p/n 50441) cost $90/each. We get a 15% educational discount. Ordered 7 holders and 14 battery packs. haines 3 56 Repair Acoustic Release s/n 29207 deployment major closed Buoy-System-2010 task haines must have 1318532274 1326300701 While testing acoustic releases (ticket:53) for deployment on bottom frames found s/n 29207 to be corroded such that the shaft arm to rotating even though unit response to command codes. Sent it to ORE Offshore (RMA 2033) to get fixed. haines 3 57 Order Marine Model Antenna for GlobalStar Modems communication major closed Buoy-System-2010 task haines must have 1318532897 1319810949 Problem: GlobalStar modem on B2 only connects during calmer seas. Patch antenna that was spec'd for us is best for land applications. There is a marine model "stick" that should be better for the rougher seas and buoy application. However it requires a adaptation since the antenna is taller than the low-profile puck originally installed. * order 2 marine models If the marine-model antenna does not fit inside canister: * drill holes on canister lid for antenna cable pass-throughs * mount antenna on poll or on plastic shelf with radiometers * make a longer canister and mount inside I doubt we want to mount the antenna on top of the GlobalStar canister as it will compromise how sealed to elements it is. We have opted for the third option. See ticket:58. haines 3 58 Make larger canister for GlobalStar modem and new, longer antenna communication major closed Buoy-System-2010 task haines must have 1319208626 1319810731 As suspected (ticket:57), the canister that holds the Globalstar modems is too short for the new, longer Quarafilar Helix (QFH) antenna. The patch antenna is 1.5" long. The new QFH antenna is 7" long. Drilling holes in existing canister and mounting the antenna on end-cap may compromise the waterproofing of the pod. Instead, we need to have Physics Shop at UNC make a longer canister so we can field swap the antenna on mount inside the canister, and swap canisters. * get specs from YSI for lathing grooves and drilling holes for trimmer-string in * purchase 5 feet of Sch80 5" PVC Pipe and Type I 0.5" thick (12"x24") PVC Sheet * get materials and specs to Physics shop haines 3 59 Order crimping tools and supplies for re-wiring to terminals in the integrated systems system integration major closed Buoy-System-2010 task haines must have 1319209886 1319209985 YSI system as built is designed for quick swapping of instruments, but requires crimping ferrule connector to wires for better physical and electrical contact within the terminal blocks. haines 3 63 Remove B1 and B2 ARGOS PTTs from service communication major closed Buoy-System-2010 task haines must have 1330705954 1330705963 Contact CLS America user services to have ARGOS PTT ids 22363 and 22438 removed from our id list. haines 3 64 Remove B1 and B2 GlobalStar numbers from service communication major closed Buoy-System-2010 task haines must have 1332190781 1335966401 David O'hara is looking into removing the two modems from service. {{{ 11601178763/ 999-008-1921 11601178914/ 999-008-1922 }}} {{{ David O'Hara NETSAT Office Direct: 303-683-4843 Fax: 866-880-7069 Cell: 303-229-7222 david.ohara@netsat.info www.netsat.info }}} haines 3 65 Resolve comm problem between CSI Loggernet and Iridium RUDICS communication major assigned Buoy-System-2010 task haines * must have 1335962885 1335962893 * Connect to CSI DataLogger CR1000 via Rudics/Iridium and CSI LoggerNet using telnet session with static IP, CR1000 responds and accepts the connection but never gets table definitions. * Contacted DJ Snodgrass at CSI-Canada. He worked on it some but had to stop. * Spoke with Kevin Simpson at YSI -- They have some upcoming project(s?) that need to resolve this issue too. YSI might be working on it too. haines 3 4 Get info on ASIMET purchase and recalibration sensor major closed Tower-System-2010 task haines must have 1277837612 1277839374 * Contact Geoff Allusp at WHOI for cost estimate on recalibrating ASIMET HRH, BARO, PSP, PIR, and RAIN modules. * contacted Jason Smith at WHOI * Contact Victor Neagoe at Star Engineering for cost estimate for four (4) wind modules. * also need lead times for this work haines 3 5 Order New WIND ASIMET Modules sensor major closed Tower-System-2010 task haines must have 1277838869 1284515490 Purchase four (4) * get quote from Star on company letter head (specify 50% upfront/ 50% 30days after delivery) * write soul source justification for using Star * submit to Paige to get have Purhasing issue a PO and cut check for 50% * 2 weeks in purchasing * 8-10 weeks lead time to build haines 3 6 Recalibrate ASIMET modules sensor major closed Tower-System-2010 task haines must have 1277838990 1288270578 * ~~Contact Jason Smith at WHOI for instructions~~ (jsmith at whoi dot edu). * ~~Order reusable crate for shipping~~ * ~~Order packing material~~ * ~~Ship ASIMET suite to WHOI~~ * Jason will assess for any repairs and return a quote of cost to repair and calibrate. * get PO or check cut for cost (may need justification letter) haines 3 13 Obtain vessel information deployment major closed Tower-System-2010 task haines must have 1285876825 1285951447 * Reed Meredith, Wahoo (Wanachese, NC) 43 foot http://sarahaines.smugmug.com/Work/Wahoo-Wanachese-NC-Sept-25/ * Capt. Krage Gardiner, Fin Galley, (Oregon Inlet, NC) 50 foot http://sarahaines.smugmug.com/Work/Fin-Galley-Oregon-Inlet-Sept/ haines 3 18 Determine power and communication requirements for UNC components system integration major assigned Tower-System-2010 task haines * must have 1286407302 1297720210 Evaluate the power consumption of each sensor and data amounts that would be downloaded every hour for SODAR, ASIMET Suite, and Bottom ADCP and CTD (using an acoustic modem, if there is an existing pull-tube). haines 3 19 Determine vessel availability and cost deployment major closed Tower-System-2010 task haines must have 1286407667 1286407691 Determine cost and availability of commercial fishing vessels to transit to and from towers and support operation. haines 3 20 Determine feasibility for camera system deployment major closed Tower-System-2010 task haines desired 1287004731 1297720124 * Contact Kurt Myers at ILN to see if a camera can be incorporated into any of the Wind systems or what it would take to accomplish this function * Type of camera, storage, comm to computer, delivery of images * Determine comm bandwidth to get images back once a day or hour haines 3 21 Determine if pull-tube can be installed deployment major assigned Tower-System-2010 task haines * desired 1287004791 1297720150 * Contact Dave Malone to see if he can install if we provide the tube haines 3 29 Determine capacity and condition of sealed Pb-Acid batteries deployment major closed Tower-System-2010 task haines must have 1291817838 1367521035 Determine if batteries slated for deployment can charge and hold intended capacity. haines 3 32 ship tower box to YSI system integration major closed Tower-System-2010 task haines must have 1294439397 1297710119 package and ship tower box to YSI haines 3 41 Test GlobalStar Communication via LoggerNet communication major closed Tower-System-2010 task haines must have 1303139728 1326301075 * Configure LoggerNet on compass.marine.unc.edu to communicate via GlobalStar to the DataLogger Tower System * Ping 10.1.64.3 -- test okay * Table Defs downloaded -- test (started but not completed) * Data Download Experiencing the same problems as with buoys -- not much time with satellite overpass plus limited sky view on Murray Hall roof access. haines 4 62 Repair Wind Dir on ASIMET s/n UNC235 communication minor assigned Tower-System-2010 task haines * must have 1326461276 1326461284 After installing all the ASIMET modules on the roof of Murray, and some run time, determined that one of the ASIMET wind modules is not returning Wind direction * confirm that only wind vain and maybe tilt y and x, and heading). * get RMA from WHOI * return to WHOI for repair haines